Kwinana Beach, WA
Adbri
Adbri
11 months
Jan-22
Nov-22
The Cockburn Cement Limited’s (CCL) Upgrade Project involves the expansion of the cement operations at Kwinana, WA. The expansion project scope included: a bulk materials conveyor linking the Kwinana Bulk Terminal (KBT) facility to a new 110,000t clinker storage shed, incorporating an automated reclaim system, to eliminate road transport and minimise clinker handling using mobile equipment; a slag feed system that will handle granulated blast furnace slag and additives such as gypsum and limestone; a ball mill circuit with the installation of two new cement mills capable of grinding slag and clinker; and a new 21,000t finished product storage, truck loading and weighbridge infrastructure for storage and despatch.
Commencing the package in January 2022, Melchor Contracting utilised in-house earthworks, electrical and instrumentation, and structural concrete capabilities. The works comprised of detailed excavation (18,000 cubic meters), backfilling (27,000 cubic meters), and construction of all major concrete structures including formwork (18,500 square meters), reinforcement (1,500 tonne) and concrete (11,500 cubic meters). A highlight of the project was the execution of a complex ball mill structure.
Improvements to construction methodology within the Cement Silos enabled Melchor Contracting to reach early completion.
Start laying the foundation for a career in Concreting with Melchor Contracting.
Read moreWe provide services that include head contracts, sub-contracting and labour hire to project owners, EPC contractors and Tier-1 civil contractors.
Get in TouchUnlock a world of diverse opportunities with a company that invests in their team’s growth and wellbeing.
Join our TeamMelchor Perth
Unit 1/3 McDonald Street
Osborne Park, WA 6017
Melchor Karratha
33 Oxide Loop
Karratha, WA 6714
Contact us